Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Installation of Set with Guardrail, Cover and Gate
Start of Work:August 2022
Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.
Comments:Work closed directly with ESJE.
Facade Installation in the Tocantins Building
Start of Work:September 2021
Summary of the scope of services:Installation, sealing and review of the front facades of the Tocantins building, including slab front railing, two sides of ACM and two L-shaped facades, one right and one left and all the louvers on the facades.
Comments:Work carried out in partnership with the company also in the frame business.
Facade Installation in the Max 3 Commercial Development
Start of Work:October 2021
Service scope summary: Installation, sealing and review of the front and back facades of the enterprise, including barrilete railings.
Notes: Work carried out in partnership with the company Metazil.
Facade Installation at Argo Construtora Headquarters
Start of Work:October 2020
Service scope summary: Installation services of auxiliary structure and frames for facade.
Notes: Work carried out in partnership with the Mediterranean company.
Instalação de Fachada e Pele de Vidro no Centro de Distribuição Tupperware
Início da Obra: Fevereiro de 2020
Resumo do escopo de serviços: Montagem e instalação de estrutura em alumínio para aplicação de fachada em pele de vidro.
Observações: Obra realizada em parceria com a empresa Aluman.
Facade Installation at Argo Construtora Headquarters
Start of Work:October 2020
Service scope summary: Installation services of auxiliary structure and frames for facade.
Notes: Work carried out in partnership with the Mediterranean company.
Facade Installation at Argo Construtora Headquarters
Start of Work:October 2020
Service scope summary: Installation services of auxiliary structure and frames for facade.
Notes: Work carried out in partnership with the Mediterranean company.
Facade Installation at Argo Construtora Headquarters
Start of Work:October 2020
Service scope summary: Installation services of auxiliary structure and frames for facade.
Notes: Work carried out in partnership with the Mediterranean company.