top of page

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Installation of Set with Guardrail, Cover and Gate

Start of Work:August 2022

Summary of the scope of services:Installation Services of a guardrail set, with sliding gate with tubular aluminum and tempered glass + cover with aluminum structure at the entrance of the Condomínio Aldeia das Laranjeiras 2, in the Residential Park of Laranjeiras.

Comments:Work closed directly with ESJE.

Facade Installation in the Tocantins Building

Start of Work:September 2021

Summary of the scope of services:Installation, sealing and review of the front facades of the Tocantins building, including slab front railing, two sides of ACM and two L-shaped facades, one right and one left and all the louvers on the facades.

Comments:Work carried out in partnership with the company also in the frame business.

Facade Installation in the Max 3 Commercial Development

Start of Work:October 2021

Service scope summary: Installation, sealing and review of the front and back facades of the enterprise, including barrilete railings.

Notes: Work carried out in partnership with the company Metazil.

Facade Installation at Argo Construtora Headquarters

Start of Work:October 2020

Service scope summary: Installation services of auxiliary structure and frames for facade.

Notes: Work carried out in partnership with the Mediterranean company.

Instalação de Fachada e Pele de Vidro no Centro de Distribuição Tupperware 

Início da Obra: Fevereiro de 2020

Resumo do escopo de serviços: Montagem e instalação de estrutura em alumínio para aplicação de fachada em pele de vidro.

Observações: Obra realizada em parceria com a empresa Aluman.

Facade Installation at Argo Construtora Headquarters

Start of Work:October 2020

Service scope summary: Installation services of auxiliary structure and frames for facade.

Notes: Work carried out in partnership with the Mediterranean company.

Facade Installation at Argo Construtora Headquarters

Start of Work:October 2020

Service scope summary: Installation services of auxiliary structure and frames for facade.

Notes: Work carried out in partnership with the Mediterranean company.

Facade Installation at Argo Construtora Headquarters

Start of Work:October 2020

Service scope summary: Installation services of auxiliary structure and frames for facade.

Notes: Work carried out in partnership with the Mediterranean company.

Facade Installation at Argo Construtora Headquarters

Facade Installation at Argo Construtora Headquarters

(27) 9 9787 1308 - Service and Sales
(27) 9 9794 1308 - Service and Finance

(27) 9 9795 1308 - Management and Technical Support

E-mail: esje@esje.com.br

Address: Rua Ipê Roxo, 43 - Feu Rosa

Serra - Espírito Santo - Brazil

CEP: 29.172-026

  • LinkedIn
  • Instagram
  • Facebook
Logo Simplificada da ESJE Esquadrias de Alumínio

© 2023 by ESJE Aluminum Frames. All rights reserved. Website created and developed by Bruno Brito (27) 9 9966-3689.

bottom of page